1

How long will a damp survey inspection last?

News Discuss 
A damp survey generally takes 30 minutes to 2 hours, but the exact duration depends on property size, layout, and damp severity. This time allows the surveyor to inspect walls, floors, and ceilings, ensuring a thorough assessment to protect your home from damage. https://www.damp-solutions.com/blog/how-long-does-a-damp-survey-take/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story