Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The project encompassed the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://mysocialfeeder.com/story5539589/penmann-completes-comprehensive-hvac-refurbishment-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme